Putting in the Plumbing! | |||
Gordon doesn't want to tell me that he accidentally glued his hand to that pipe...damn copper plumbing... |
Gordon is much happier working with the PVC piping...you can tell by the big smile |
"Get that frickin' camera out of my face...y'all" Had to get a y'all in there somewhere... |
The drainage system taking the water - and other stuff - out to the septic field |
The bathroom fixtures are in!
Thanks |
Though it is a little tough for a guy to get a little privacy in a bathroom without walls |
And Look! Running Water! We still need the generator going to run the pump, but it works!
|
|
Staining the Outside of the Building | |||
Mama Bear Elisa overcomes her fear of heights and hops up on the scaffolds to work on staining! |
And look at this! We've now got her up on 2 levels of scaffolds! And she's smiling! |
Gordon finishes off the plumbing early and lends a hand staining |
Gordon's Boy R.C. helps out. |
Brian power washing the front of the cabin
|
My pal Randy jumps up to lend a hand... |
The results of our work...the back of the cabin is stained! |
Another angle of the back corner of the cabin. |