A Step-by-Step Guide to the
Process of Completing my Cabin
Excavating the Hole &
Septic System (Click Here for More) |
|||
The hole for the foundation |
The Septic Sytem |
Brian in the excavated hole |
The big digging machine |
The Foundation is Poured (Click Here for More) |
|||
The foundation |
Gives you a little perspective on the size of the house |
Ken and Randy |
Another angle |
Stacking the Logs (Click Here for More) |
|||||
The trucks arrive |
The logs get stacked |
First layer of logs |
The first corner is complete |
The header log is placed |
We have started on the second floor |
Lifting a log into place |
Mike & Rob build the |
The windows looking over the lake |
Building the A-truss |
Building the second floor |
Raising the A-truss into place |
The 2nd Floor |
My loft! |
Side view |
The loft has a ceiling! |
The front view |
The purlins |
Rob making some cuts |
View from the Lake |
Side view |
T&G on the Roof |
I love this angle! |
Brian waves down from his perch. |
Tongue and Groove & Roofing (Click Here for More) |
|||
Hanging some tongue-and-groove |
We've still got a long way to go. |
The Styrofoam Insulation is in |
The OSB gets put on before the metal |
Putting on the Metal Roof (Click Here for More) |
|||
The beginnings my metal roof. |
Here we see my crew putting the finishing touches on the roof |
This is my FAVORITE view of the roof |
The front of the house overlooking the lake |
The Cabin Survives It's
First Winter (Click Here for More) |
|||
Close Up of the house from the lake |
A Great View of the Cabin from the "almost" frozen lake |
A Different Angle |
One more Angle |
|