A Step-by-Step Guide to the
Process of Completing my Cabin
Excavating the Hole &
Septic System (Click Here for More) |
|||
![]() The hole for the foundation |
![]() The Septic Sytem |
![]() Brian in the excavated hole |
![]() The big digging machine |
The Foundation is Poured (Click Here for More) |
|||
![]() The foundation |
![]() Gives you a little perspective on the size of the house |
![]() Ken and Randy |
![]() Another angle |
Stacking the Logs (Click Here for More) |
|||||
![]() The trucks arrive |
![]() The logs get stacked |
![]() First layer of logs |
![]() The first corner is complete |
![]() The header log is placed |
![]() We have started on the second floor |
![]() Lifting a log into place |
![]() Mike & Rob build the |
![]() The windows looking over the lake |
![]() Building the A-truss |
![]() Building the second floor |
![]() Raising the A-truss into place |
![]() The 2nd Floor |
![]() My loft! |
![]() Side view |
![]() The loft has a ceiling! |
![]() The front view |
![]() The purlins |
![]() Rob making some cuts |
![]() View from the Lake |
![]() Side view |
![]() T&G on the Roof |
![]() I love this angle! |
![]() Brian waves down from his perch. |
Tongue and Groove & Roofing (Click Here for More) |
|||
![]() Hanging some tongue-and-groove |
![]() We've still got a long way to go. |
![]() The Styrofoam Insulation is in |
![]() The OSB gets put on before the metal |
Putting on the Metal Roof (Click Here for More) |
|||
![]() The beginnings my metal roof. |
![]() Here we see my crew putting the finishing touches on the roof |
![]() This is my FAVORITE view of the roof |
![]() The front of the house overlooking the lake |
The Cabin Survives It's
First Winter (Click Here for More) |
|||
![]() Close Up of the house from the lake |
![]() A Great View of the Cabin from the "almost" frozen lake |
![]() A Different Angle |
![]() One more Angle |
![]() |