A Step-by-Step Guide to the Process of Completing my Cabin

Page 5

Wallpaper & Interior Trim
(Click Here for More)
0cabin32 (2)
Cherish pre-stains
all the boards for
easy assembly!

 

0cabin32 (5)
...and Brian goes
inside and nails
them in place
0cabin32 (0)
Wallpaper in the
master bedroom
wolves & birch bark
0cabin32 (7)
Loft Area
wallpaper -
a different
wolf scene
Building the Upstairs Porches
(Click Here for More)
4cabin32 (4)
The girls stain
the boards for the
upstairs porches
4cabin32 (1)
Brian throws the
boards down on
the porch
4cabin32 (3)
Mike Evans waves
Hello to all his
adoring fans!
 
4cabin32 (2)
The other side of
the house
Building the Log Light for the Great Room
(Click Here for More)
1cabin32 (6)
Grindering the log
ends (don't ya just
love that word?)
1cabin32 (3)
Drilling a hole thru
the log to pass
the wire thru to
the bottom...
 
2cabin32 (5)
Attaching the
track lighting to
the log
1cabin32 (9)
The finished
project!
Installing the Blinds
(Click Here for More)
5cabin32 (1)
Mom pre-drills the
holes for the blinds
 
5cabin32 (0)
Cherish unpacks
the blinds
5cabin32 (4)
Check out Mom's
look of intense
concentration
5cabin32 (2)
Check out the
Blinds!
 
Staining the Porches & Applying the UV Guard
(Click Here for More)
0-brianslogcabin (7)
The upstairs
porches get a
coat of stain
 
 1-brianslogcabin (17)
Taping out the
windows takes longer
than actually spraying
1-brianslogcabin (22)
Gary sprays the
porch overhang
1-brianslogcabin (5)
Brian works on
UV spraying
the 2nd story...
Building the Deck
(Click Here for More)
P5010017
Framing the Deck
DSCF0153
Laying the deckboards
DSCF0168
Installing he railings
deck-staining(4)
Staining the deck